Private Healthcare
Hospital mechanical services and infrastructure review and site capacity assessment for future requirements with design and documentation to centralise new major equipment to a main plantroom.
Hospital mechanical services and infrastructure review and site capacity assessment for future requirements with design and documentation to centralise new major equipment to a main plantroom.
Conducted a fatigue analysis with supplemental finite element analysis (FEA) post-operational failure to determine cause and provide recommendations for remedial action.
Seismic review of services to NZS 4219 for a two storey apartment complex with producer statements (PS2) and follow up PS4 inspection.
Multiple hoist certifications including analysis and modelling with supplemental finite element analysis (FEA) provided for council water treatment plant workshop pump maintenance.
Full design and documentation for a new Tech Block construction involving metalwork, woodwork and fabric workshops. The design involved welding bays interlocked with openable windows for makeup air and a centralised ducted dust extraction system.
Analysed and reverse-engineered a failed design to determine cause using Australian Standards and supporting finite element analysis (FEA) for the stainless steel floating pontoon mixers at a water treatment plant (WWTP) and to predict an expected design life.
Performance specification, infrastructure assessment, initial design and layouts of HVAC for the library and community hub, to ensure satisfactory temperature control with the large solar gains of the glazed façade and non-disruptive ventilation to meet the quiet interior requirements.
The Westfield Mall car park project was a design review and producer statement (PS2) for Auckland City Council for the jet fans of a 934 parking car park ventilation computational fluid design (CFD) as an Alternative Solution to the intentions of the New Zealand Building Code, clause G4 and AS 16
As design lead for mechanical services over 3 years, the scope of this 42,000m2 design project involved operating and hybrid theatres, radiology, plantroom layouts, dentistry, audiology, day-stay, consult rooms, patient bays, PACU, isolation suites, HDU related to the following buildin
Responsible for the delivery and formulation of processes for the reporting criteria for seismic, fire and general risk assessment for all 17 national prison sites. This involved working with and clarifying a broad and generalised scope to work with client requirements, and coordination of multi